Objective: Model modular power distribution corridor for U.S. Navy ship systems including main bus cabling, conversion, and energy storage
Solution: Developed a CAD model dependent on power input, desired power output, current, and other parameters, of a Navy Integrated Power Energy Corridor section integrating Power Electronic Building Blocks (PEBBs), cooling, control, and cabling systems
Skills Applied: Rhino 3D, Grasshopper, Python

Final CAD model in Rhino of initial example model given but now implementing parameterization and design optimization

Snapshot of part of Grasshopper building blocks used to create the final parametric model implementing over 50+ design constraints and including main bus cabling, conversion, and energy storage

Other Projects

Back to Top